Connect with us

Hi, what are you looking for?

Archive

IWC gives safety priority in bridge replacement application

Advertisement

KENT—The Inland Wetlands Commission will seek additional data on plans to replace a crumbling bridge spanning Cobble Brook at 99B Cobble Rd. as quickly as possible and will then call a special meeting to act on the proposal.

Steven Abbate appeared before the commission Feb. 26 with an altered proposal for the bridge’s replacement after the owner of record, the Northwest Connecticut Land Conservancy, refused permission to stockpile material on its property during construction and to remove trees from its land. The NCLC had initially given permission and later withdrew it.

Abbate’s property is landlocked except for a 50-foot right of way across the brook to Cobble Road. The bridge, which passes over a culvert, is in danger of collapse because the culvert pipe is rotted out. 

Michael Gawel, owner of Gawel & Sons Construction, explained that beavers dammed the uphill end of the pipe and that the pressure folded the ends inward. “The pipe was put in 1985-ish and is at the end of its lifespan,” he said, adding that with the narrowed opening, “every time there is a heavy rain, it floods and washes out around it.”

The application is further complicated by a question of whether the Department of Energy and Environmental Protection should be involved in the bridge construction.

Land Use Officer Tai Kern said town counsel advised that the IWC could make its decision irrespective of DEEP and “leave it to the property owners whether to go forward.”

She noted that the application was significantly altered only that afternoon, but that the IWC’s timeframe for making a determination ended with its meeting. Chairman Lynn Werner was reluctant to act on a proposal that had been changed without time for review. 

“Do we have enough time to understand what this new application is?” she asked. “My concern is, we’re being rushed into a decision tonight. It feels to me like I haven’t had enough time to fully absorb the letter and the changes.”

Kern said the previous proposal was drawn up by a civil engineer, but the revision was made by a structural engineer. The applicants argued that no changes were being made to the construction of the bridge itself as previously proposed.

Abbate said the last-minute changes were made because he had only received the NCLC’s withdrawal of permission on Feb. 23. He stressed the urgency to act on the replacement and said the plan submitted Monday was simpler than the previous proposal.

“Only Friday did we receive a letter from the land trust that withdrew its approval for some aspects of the job,” he said. “We would have had to sign licensing agreements, agree to fines and penalties, etc. So, we’re not going to go on their property; we’re not going to cut trees, and we moved the stockpiling to my right of way. We’re not going to put boulders in the riverbed because that would go beyond the 50-foot right of way and because the commission didn’t like that idea the last time we appeared. We just took three things away and are doing everything else within the right of way.”

The current bridge is in such poor condition that emergency vehicles cannot reach his house. The residents have instructed the propane delivery company to bring only light loads. Efforts were made to reinforce the existing bridge but, with spring coming on, it is beginning to collapse again, Abbate said. 

Gawel argued that the new proposal brings “far less intrusion into the regulated area.” 

“It’s simpler than it was. I don’t see why we should need a civil engineer. The only time the stream will be touched is when we pull the pipe out—and that is quick. Everything will be stable before we pull the pipe out.”

Kern said a civil engineer would provide different information than a structural engineer.

Werner feared that returning the streambed to its original 14-foot width would cause siltation below the bridge to be disturbed. She stressed she would like more time to consider the application and that a civil engineer should look at the plan. “I just don’t want any unintended consequences,” she said, adding she hadn’t found the original plan “sufficient.”

“I’m just scratching my head and thinking we gave you everything you asked for and gave you a simpler plan,” said Abbate. “We have to bring in 60 tons of material every time it washes out. This thing is completely rusted out and rotted on the bottom and it puts my family in danger.”

Other members of the commission felt the safety factor outweighed any lingering doubts. Member Anthony Palumbo said he found the situation “a little scary,” while Marge Smith said, “Yes, silt will move around a little bit if the stream goes back to its original width, but this is a vast improvement over a five-foot-wide pipe. Safety is a bigger issue.”

A compromise was struck when it was agreed that the town would have its consulting civil engineer look at the proposal as quickly as possible and that a special meeting would be called to act within 24 hours after that report is in hand. Abbate will pay for the review.

“I feel there is an urgency here,” said Palumbo. “It seems like there’s not much impact to the stream and the urgency outweighs other circumstances.”

In other business, an application from Karen Pittelman to remove invasives along Cobble Brook was withdrawn temporarily and John Slowik, who has drainage problems at 111 Geer Mountain Rd., asked to have his application tabled until more information is available.

Albert Loverro appeared before the commission to present his application to removed invasives and dead or dying trees from his property at 310 Kent Cornwall Road but was told that he had to file a more complete application. His neighboring property owners also appeared, saying they were unhappy with previous alterations to his land that they asserted diverted runoff to their own properties. 

The commission decided that a physical review of the site is in order, but Werner advised the neighbors that the commission is “not an arbiter” of property surveys.

Advertisement
Kathryn Boughton
Written By

Kathryn Boughton, a native of Canaan, Conn., has been a regional journalist for more than 50 years, having been employed by both the Lakeville Journal and Litchfield County Times as managing editor. While with the LCT, she was also editor of the former Kent Good Times Dispatch from 2005 until 2009. She has been editor of the Kent Dispatch since its digital reincarnation in October 2023 as a nonprofit online publication.

Subscribe

Sign up to receive email updates including a “Dispatch Digest” each week.

*

Upcoming Events

You May Also Like

News From Nearby Towns

SHERMAN—The Sherman Library, 1 Sherman Center, is starting off the new year with a new art show, “Devil in the Details,” drawings by Christina Maschke....

Featured

KENT—The much-discussed implementation traffic safety cameras went down to a resounding defeat Tuesday, Jan. 7, when townspeople voted 391 to 104 against their use....

Local

KENT—Christmas trees can be dropped off at the town garage, 38 Maple St., anytime. Trees should be left near the “fishing pond.” Make sure...

Opinions

To the Editor: I’m writing with one suggested correction to Karen Chase’s otherwise wonderful January “Remembering Civics” column on local government. Thank you, Karen....

Opinions

We are in the midst of football frenzy. The regular season is over, and we are on to the playoffs and ultimately the Super...

Local

KENT—Bobcats among us. Who would have thought that? The Kent Memorial Library will present a special program on bobcats in Connecticut at its annual...

Featured

KENT—The Planning and Zoning Commission is working methodically forward in its consideration of regulations to the growth, manufacture, distribution and sales of cannabis products in...

Schools

NEW BRITAIN—Registration is now open for the 20th annual eesmart student contest, presented by the Energize Connecticut sponsors, Eversource and Avangrid, Inc. subsidiaries United Illuminating, Southern...